Publicly listed companies exploring for rare earths in Brazil report their progress to the market in technical terms: the grade of a drill hole, the result of a test, a sales agreement. What these announcements generally do not address is where the underlying mining right stands, and that information sits in the tenement registered with the National Mining Agency (ANM). Compared side by side, the two sources show that a project’s technical stage and its procedural status do not always match.
We checked this in three projects, using the Mining Registry (Cadastro Mineiro) on November 13, 2026. The subject is a priority: rare earths are in Class 1 of the list of 27 critical and strategic minerals approved by the National Council for the Industrialization of Critical and Strategic Minerals (CIMCE) on November 5.
Three Projects, Three Different Points
At Morro do Ferro (Minas Gerais), Power Minerals reports a drill intercept of 88 m (measured along the hole) at 6.33% TREO, short for total rare earth oxides, and plans a first JORC Mineral Resource estimate. In the Mining Registry, however, the project sits in a Mine Manifest dating from 1947, now a Development Concession (tenement 005.444/1946), which already lists rare earths among its substances and had a reserve reassessment report for rare earth oxide approved in 2017. The ANM record is therefore ahead of the technical stage announced. On the date of the query, the Registry showed Mineração Terras Raras S.A. as titleholder, and the sector press reported that Power completed the purchase of the project in April 2026.
At Ema (Amazonas), BCM released leach test results that the company itself classifies as screening data. Tenement 880.184/2016 shows that the ANM approved, on June 24, 2026, the exploration report for “rare earth ore” and, on August 26, declared the tenement fit to receive the Experimental Mining License (GU), which authorizes exceptional extraction before the Development Concession is granted. The record lists gold and silver as substances. The registered titleholder is Mineração BBX do Brasil Ltda.
At Serra Negra (Minas Gerais), Oceana is running a drilling campaign of about 20,000 m and has not yet declared a Mineral Resource. The three tenements reviewed (830.280/1985, 830.077/1988, and 831.298/1984) are at the Application for Exploitation stage (filed between 2011 and 2013), with phosphate, bauxite, titanium, and dunite registered as substances. On August 5, 2026, an exploration report for a new substance was filed in all three. Three of the project’s six tenements were reviewed.
What the Registered Substance Changes
The difference matters because of the rule: the holder of a Development Concession may extract only the substances named in the title, and any others require an amendment to the title (Decree No. 9,406/2018, art. 34). After the exploration permit term ends and the report is filed, the titleholder may continue work to identify and quantify new substances, but extraction still requires prior ANM authorization (art. 9, §§ 7 and 8). The amendment itself is regulated, for Development Concessions, by Ordinance No. 155/2016 (art. 129). For the Experimental Mining License (GU), ANM Resolution No. 240/2026 (published in the Federal Official Gazette (DOU) on June 1, 2026) requires an environmental license, or equivalent document, that names the substance in the application and is issued in the titleholder’s name (art. 105).
Caveats in the Announcements
Some announcements carry conditions that deserve a careful read. Axel reported, on November 9, an exemption from state environmental licensing and a registration of insignificant water use, valid for three years, for its field program at Woolrich (Minas Gerais). The company states that the exemption applies only to state licensing and that other authorizations are still required, such as those for permanent preservation areas and vegetation clearing. The water-use registration is a registry filing, not a water-use grant (outorga), and about 58% of the Woolrich resource is classified as Inferred. Likewise, the roughly US$915 million of minimum revenue in Viridis’s agreement with Rhodia (Solvay group), announced on November 5, results from minimum volumes and price floors between 2029 and 2034 and depends on delivery of the contracted volumes.
For anyone assessing a project, whether to invest, assign, or acquire a title, the announcement is the starting point. A full reading requires confirming the tenement number and its stage in the Mining Registry, the registered substance, the titleholder and history, what the environmental document covers, and whether the figure released is a peak or average grade, an Inferred Resource or a reserve (ANM Resolution No. 94/2022).
Informational text, based on public records and company announcements. Sources: Mining Registry (Cadastro Mineiro), ANM (public query, November 13, 2026); company announcements to the ASX; Decree No. 9,406/2018; Ordinance No. 155/2016; ANM Resolution No. 240/2026; IGAM Ordinance No. 48/2019.
📷 AI-generated image













